top of page

Patrickswell

Site Area 2.01 Ha

Floor Area 1805m²

Completed 2011

 

The school for children with autism is a temporary school comprising of prefabricated buildings to provide 10 classrooms for 60 children. A library, large activity hall and offices complete the accommodation in County Limerick. The prefabricated units have been insulated to a high level and clad in profile metal cladding providing a robust comfortable building. using muted contrasting colours providing a robust building visual interest to the elevation.

33-henry-st-009-beag
doon-community-hall-003-beag
33-henry-st-006-beag

Unit 3 Chapel Court
Cathedral Place
Limerick
Eire
T 061 462018
F 061 609662
E reception@carrarchitects.ie

  • Facebook Social Icon
  • Google+ Social Icon
  • Pinterest Social Icon
bottom of page